A very favorable reaction from the Ministry of Forests is a credit to your design of this pipe. Installation went very well and we did not have to realign the creek channel. The retention of the stream banks is of utmost importance and EnviroBridge fits that requirement very readily.

Jack Elder, Logging Supervisor i/c Road Construction, Weyerhauser Canada Ltd.

This structure is robust and exceeds all normal design strength requirements.

D.S Cunliffe P.Eng., Engineer

We’ve found this product to be very easy to handle and install, as well as being very rugged. Two of the bridges have been relocated a number of times without losing any structural integrity.